• Oct
  • 20

Case Study - Thailand Ture IDC Data Center

Case Study - Thailand Ture IDC Data Center
ProjectName:TrueIDC-TrueBangnaTrueBangnaislocatedinBangkok,Thailand.Inordertoachievesmartbatterymanagement andmaintenance,PILOTPBATIntelligentBatteryMonitoringSystemwasinstalled atsitetoreal

Read More

  • Jun
  • 19

Case Study——Shenzhen ZTE Xili R & D IDC

Case Study——Shenzhen ZTE Xili R & D IDC
In order to achieve battery smart management, PILOT PBAT battery online monitoring system (one-two solution) was installed in 2000 batteries in Shenzhen ZTE Xili R&D IDC.

Read More

  • Jun
  • 02

PILOT Online Prepaid System Apply to The Chinese University of Hong Kong (Shenzhen)

PILOT Online Prepaid System Apply to The Chinese University of Hong Kong (Shenzhen)
About 3000pcs prepaid energy meters were installed in the students’ dormitories and connected to PILOT SmartPM1100Net Online Prepaid System.

Read More

  • Mar
  • 27

A Recognition for PILOT SmartPM Optergy Billing System

A Recognition for PILOT SmartPM Optergy Billing System
A Recognition for PILOT SmartPM Optergy Billing System from Guangzhou Tianhe Wanxiang Co.,Ltd

Read More

  • Mar
  • 07

Beijing TaiHeQiao IDC case study

Beijing TaiHeQiao IDC case study
Beijing TaiHeQiao IDC——Case study for PILOT PBAT Battery Monitoring System

Read More