Leave Your Message
Pilot's Commercial and Industrial (C&I) Battery Energy Storage System (BESS) PL-ESS-500/1075-0.4-L(DCplusAC)

ESS

Pilot's Commercial and Industrial (C&I) Battery Energy Storage System (BESS) PL-ESS-500/1075-0.4-L(DCplusAC)

Pilot Integrated ESS is highly combined with LFP battery system, BMS, PCS, EMS, liquid cooling system, fire protection system, power distribution and other equipment inside the cabinet. Provide economic, safe, intelligent, and convenient electricity solutions for industrial and commercial users.

Highlights:

Peak Shaving and Valley Filling: Charging and discharging based on the time-of-use electricity pricing policy to take advantage of the peak-to-valley price difference and reduce electricity costs.

Grid Off-switching: supports off-grid operation, serving as a backup power source to ensure continuous production.

Demand Management: Real-time monitoring of transformer power. Dynamically adjusting discharge power to achieve demand management, reducing capacity-related electricity expenses.

Solar-Storage Integration: interacting with photovoltaic to increase solar penetration and minimize the carbon emission.

Demand Response/VPP: Adjusting charging and discharging strategies based on electricity market demands, participating in demand response/ancillary services markets to gain additional revenue.

All-in-one solution for:

●Microgrid & Off-Grid

●Utilities

● Photovoltaic Operation

●Solar-BESS-Charging System

● Industrial Applications

      Product Introduction

      essg23

        Wind-Solar-Diesel-BESS All-in-One Cabinet

      • Save construction cost:In remote areas, off-grid energy supply systems are often more cost-effective than connecting to the grid.
      • Ensure reliable power supply:The "wind + solar + diesel" hybrid architecture, combined with energy storage system, ensures power supply continuity and improves power quality.
      • On-site consumption of wind and solar energy:Utilize the energy storage system to fully absorb wind and solar resources, maximizing energy savings and emission reductions.
      • Flexible deployment and expansion:Highly integrated cabinet design allows for quick deployment, reduces on-site debugging and installation workload, and allows for flexible expansion.
      • Applications:Best choose for Oilfield, Mines, Island, Remote Communities, and so on.
      bess applicationjje

        Hierarchical Microgrid Control System

      • Grid-Connected Operation:Demand response, peak shaving, dynamic capacity expansion, demand management, anti-backflow.
      • Off-Grid Operation:Islanding detection, on/off-grid switching, frequency and voltage emergency response, black start.
      • Microgrid EMS:Load Forecasting, Generation Forecasting,Economic optimization,Carbon emission management,AGC/AVC,Demand response,Islanding detection,Black-start.
      • Industrial Applications Sectors:Commercial building, Healthcare, Manufacturing, Data center, and so on.
      essuew

        Solar-BESS-Charging System

      • PV: Select PV parking shed, rooftop PV and BIPV according to the location.
      • BESS:Choose different capacity according to the site needs.
      • Charging Station:Configure charging piles with different powers and types according to the charging requirements.

      Specification

      Model

      PL-ESS-500/1075-0.4-L(DCplusAC)

      DC-side parameters

      Cell type

      LFP energy storage cell

      Grouping method

      1P238S*6

      Nominal energy

      1280kWh

      Working voltage

      666V~856V

      Rated charge/discharge rate

      0.5P

      AC-side parameters

      AC rated power

      500kW

      Rated power grid voltage

      380V

      Rated power grid frequency

      50HZ

      System parameters

      System efficiency

      ≥90%

      Depth of discharge

      95% DoD

      Number of cycles

      ≥8000

      IP rating

      IP54(PACKIP67)

      Operating temperature

      -30℃~55℃

      Cooling mode

      Optional air cooling / liquid cooling

      Fire protection system

      Perfluorohexanone PACK-level fire protection + active early warning

      Dimensions

      DC side: 6058*1300*2000 (mm)

      AC side: 1300*1300*2200 (mm)

      Weight

      18t

      Containerized BESS (Air Cooling)

      Type

      Energy (MWh)

      Power (MW)

      DC Voltage

      Grouping

      Num. of Packs

      Num. of Clusters

      L*W*H

      (mm)

      Weight

      (Ton)

      Cell (Ah)

      1

      15-foot Container,

      1000V system

      0.52

      0.25

      627

      1P14S

      14

      3

      4515*2438*2896

      12

      280

      2

      20-foot Container,

      1000V system

      1.28

      0.64

      761.6

      1P14S

      14

      6

      6138*2438*2896

      18

      280

      3

      40-foot Container,

      1000V system

      2.56

      1.28

      761.6

      1P14S

      17

      12

      12192*2438*2896

      35

      280

      4

      40-foot Container,

      1500V system

      3.27

      1.64

      1299.2

      1P14S

      29

      9

      12192*2438*3200

      46

      280

      Containerized BESS (Liquid Cooling)

       Type

      Energy (MWh)

      Power (MW)

      DC Voltage

      Grouping

      Num. of Packs

      Num. of Clusters

      L*W*H

      (mm)

      Weight

      (Ton)

      Cell (Ah)

      1

      20-foot Container,

      1500V system

      2.75

      1.5

      1228

      1P14S

      8

      8

      6058*2438*2591

      28

      280

      2

      20-foot Container,

      1500V system

      1.28

      0.64

      761.6

      1P14S

      17

      6

      6638*2438*2896

      18

      280

      3

      20-foot Container,

      1500V system

      2.56

      1.28

      761.6

      1P14S

      17

      12

      6138*2438*2896

      35

      280

      4

      20-foot Container,

      1500V system

      3.27

      1.64

      1299.2

      1P14S

      29

      9

      6638*2438*2896

      46

      280

      cases

      solar bess charging applicationqy5
      Project:100 kWp PV system, 8 DC EV
      Application:Photovoltaic Operation/ Solar-BESS-Charging
      Location:China
      microgrids and off-grid application8dx
      Project:150kWp PV system,100kW/232kWh BESS, two 120 kW DC chargers and five 7kW AC chargers
      Application:Microgrid & Off-Grid
      Location:Thailand
      0102